Route Design
VKN DESIGN ENGINEERING SERVICES LLP
We specialize in designing transmission towers with precision and efficiency.
Snapshot Views for Various kV Rating

Examine Tower Strength for 400 kV Conductor replacement using method-4 in PLS CADD Environment

Construction & Maintenance load verification for 132 kV Earthwire Replacement using Method-4 PLS CADD

Profile View

Plan View

Upgrading of existing line: After updating the New conductor details, critical on swing Angle.

Upgrading of existing line: Included counter weight to arrest the swing angle.

Validating using method 4: 500 kV S/C line for Algeria

Modification 400 kV Using ERS to Increase The Vertical Clearances: Tower & ERS Structure for UAE

500 kV HVDC – SAUDI ARABIA

500 kV HVDC – SAUDI ARABIA

66 kV D/C PLAN & PROFILE JORDAN

66 kV D/C APC PLANT" TO "INTAKE PUMPING STATION- JORDAN